Solutions

Sectors

🇺🇸 English - US

24 boxes of documents were shredded at Sousa Andrade

24 boxes of documents were shredded at Sousa Andrade

24 boxes of documents were shredded at Sousa Andrade

How the Goiás-based construction company transformed its safety management, eliminating dependence on paper and email, and ensuring immediate traceability and legal security.

How the Goiás-based construction company transformed its safety management, eliminating dependence on paper and email, and ensuring immediate traceability and legal security.

How the Goiás-based construction company transformed its safety management, eliminating dependence on paper and email, and ensuring immediate traceability and legal security.

rural producer in a field, using a tablet

24

eliminated paper boxes

+1,300

Active employees

10 min.

To respond to the legal department

24

eliminated paper boxes

+1,300

Active employees

10 min.

To respond to the legal department

24

eliminated paper boxes

+1,300

Active employees

10 min.

To respond to the legal department

24

eliminated paper boxes

+1,300

Active employees

10 min.

To respond to the legal department

before the gap

The challenge

The challenge

The challenge

The construction company Sousa Andrade, a reference in Goiânia, deals with large volumes of technical and OHS (Occupational Health and Safety) documentation. Simultaneous construction sites, rotating teams, and varied suppliers require constant control of documents, training, and legal requirements.


At a construction site, the volume of paper can be daunting: a recently delivered project sent 24 boxes of documents solely related to Occupational Safety for archiving. Relying on physical files and emails created a risk of loss, lack of traceability, and trouble finding documents at critical moments.

The construction company Sousa Andrade, a reference in Goiânia, deals with large volumes of technical and OHS (Occupational Health and Safety) documentation. Simultaneous construction sites, rotating teams, and varied suppliers require constant control of documents, training, and legal requirements.


At a construction site, the volume of paper can be daunting: a recently delivered project sent 24 boxes of documents solely related to Occupational Safety for archiving. Relying on physical files and emails created a risk of loss, lack of traceability, and trouble finding documents at critical moments.

The construction company Sousa Andrade, a reference in Goiânia, deals with large volumes of technical and OHS (Occupational Health and Safety) documentation. Simultaneous construction sites, rotating teams, and varied suppliers require constant control of documents, training, and legal requirements.


At a construction site, the volume of paper can be daunting: a recently delivered project sent 24 boxes of documents solely related to Occupational Safety for archiving. Relying on physical files and emails created a risk of loss, lack of traceability, and trouble finding documents at critical moments.

“Before GEC, if someone needed a document, it was hard to find.”

Jonnatas Couto

EHS Supervisor - Sousa Andrade

What changed in practice

Main results

Main results

Main results

After implementation, Sousa Andrade achieved visible gains:

After implementation, Sousa Andrade achieved visible gains:

After implementation, Sousa Andrade achieved visible gains:

Document lookup in seconds.

Document lookup in seconds.

Faster and more accurate audits.

Faster and more accurate audits.

Less time spent on bureaucratic tasks.

Less time spent on bureaucratic tasks.

Cloud centralization, eliminating the need to send boxes to physical archives.

Cloud centralization, eliminating the need to send boxes to physical archives.

Access control praised by the Ministry of Labor.

Access control praised by the Ministry of Labor.

Technicians accessing everything on their phones, from any construction site.

Technicians accessing everything on their phones, from any construction site.

“Today, with the GEC module, when the legal department requests something for a labor lawsuit, we reply to the email with the documentation in 10 minutes.”

Jonnatas Couto

Sousa Andrade

Advice for the sector

Advice for the sector

Advice for the sector

Digitizing is not just about gaining speed, it is about eliminating risks, ensuring traceability, and building an operation supported by reliable information.


For civil construction, the impact is even greater: multiple jobsites, high turnover of third parties, and a large volume of documents require a system that supports growth without losing control.

Digitizing is not just about gaining speed, it is about eliminating risks, ensuring traceability, and building an operation supported by reliable information.


For civil construction, the impact is even greater: multiple jobsites, high turnover of third parties, and a large volume of documents require a system that supports growth without losing control.

implemented modules

The GAP solution

The GAP solution

The GAP solution

Implemented in 2023, the GAP system centralized all documentation for internal employees and third parties. The impact was immediate: more control, greater agility, and a team that can dedicate its time to the field — rather than searching for documents.

Implemented in 2023, the GAP system centralized all documentation for internal employees and third parties. The impact was immediate: more control, greater agility, and a team that can dedicate its time to the field — rather than searching for documents.

Equipment Management

+100

Registered and monitored equipment

+2,000

Inspections conducted in 2023

300

Average monthly inspections

Equipment Management

+100

Registered and monitored equipment

+2,000

Inspections conducted in 2023

300

Average monthly inspections

Third-Party Management

6

Projects managed since the beginning of the partnership

+1,300

Active contributors

+100

Native companies

+2,000

Average number of documents analyzed/month

Third-Party Management

6

Projects managed since the beginning of the partnership

+1,300

Active contributors

+100

Native companies

+2,000

Average number of documents analyzed/month

Impact of the Partnership

Impact of the Partnership

Impact of the Partnership

The Sousa Andrade case shows how the Goian construction company revolutionized its OHS management, overcoming the challenge of an immense volume of documents in an environment of simultaneous construction sites and high turnover.


The previous scenario was critical: reliance on physical archives and emails created risks of loss and delays — evidenced by a single construction project that resulted in 24 boxes of documents for the dead file.

The Sousa Andrade case shows how the Goian construction company revolutionized its OHS management, overcoming the challenge of an immense volume of documents in an environment of simultaneous construction sites and high turnover.


The previous scenario was critical: reliance on physical archives and emails created risks of loss and delays — evidenced by a single construction project that resulted in 24 boxes of documents for the dead file.

Stop managing OSH on paper. Start now.

Stop managing OSH on paper. Start now.

Simplify your Risk Management, reducing liabilities and ensuring safe, standardized, and auditable operations with fast implementation and advisory support.

Simplify your Risk Management, reducing liabilities and ensuring safe, standardized, and auditable operations with fast implementation and advisory support.

(11) 93768 - 3600

(11) 93768 - 3600

Nicomendes Alves dos Santos Ave, 3600 - Room 326 - Morada da Colina, Uberlândia, MG

Nicomendes Alves dos Santos Ave, 3600 - Room 326 - Morada da Colina, Uberlândia, MG

contact@sistemasgap.com.br

contact@sistemasgap.com.br

Subscribe to our Newsletter

and stay up to date with all the latest news in EHS